Cairn Curran Reservoir Outlet Upgrade Stage 1

Balance Beam Situation
Author: Jim Wheelhouse, Project Delivery Catchment Services, GMW. Cairn Curran Reservoir is part of the Loddon System and is located on the Loddon River, upstream of Baringhup near Maldon in Victoria. Cairn Curran Reservoir is operated in conjunction with Tullaroop and Laanecoorie Reservoirs. The outlet works are situated through the main embankment, and comprise a wet intake tower, a concrete culvert housing the two outlet conduits, and a power station and outlet valve at the downstream end. The service gate, in the intake tower, comprises two separate gate sections which can be coupled together to close off both the penstock and irrigation conduit. The service gate is suspended from an electrically driven wire rope hoist housed in the top of the tower. The service gate(s) travels down guide rails which run the height of the 32m tower and control the position of the gate(s) to the bottom of the tower. Near the bottom of the tower the gate(s) additionally engage heavily constructed main rails designed to take the water forces acting on the gate(s).

Records show that the hoist was originally tested (circa 1958) with both gates suspended and moved down and up the tower to close off both conduits, also that the larger gate (only) was closed into partial flow. Since this time only the larger of the two gates has been suspended from the hoist, the smaller gate has been uncoupled and unused, stored in an alcove below the tower operating deck. The primary purpose of the service gates is to act as an emergency closure guard gate in the event of a failure of the downstream equipment in the outlet. The Cairn Curran Outlet Works Upgrade - Final Report for Review of Emergency Guard Operation (GHD 2012) confirmed that the combined weight of the two gates (20 tonne) is necessary to ensure closure under flow conditions. A thorough current condition assessment of the hoist to confirm the hoist is adequate for continued service carrying both gates. A major project challenge was working with leakage through the existing closure stop logs at a rate of 4 ML/d. 591,000. During the outage, riparian releases were passed downstream through a low flow valve attached to one of the radial flood gates. Stage 2 works will include replacing the electrical and control system, replacing conduit air valves and automation of the irrigation conduit guard gate.

Advice and future study benefits what we already know. Learning and enhancing our skills is empowering. The world you create is in your own hands. Waiting and depending on others will only limit you. Take control and molding the life that you want to lead. Material progress. Good financial news arrives. CAPRICORN (December 22-January 19) Temperance: Moderation. Balance. Taking the negative with the positive and making the most from it. Level-headed experience and advice. Going with the flow of things now. Patience. A rainbow. A bridge between heaven and earth. You're a child of the Gods. Others call you an angel. Take time to stop and smell the roses. Healing. Spirit and matter connection. Intuition is crystal clear. Making the best from a new adventure or relationship. Economic. Living the simple life with gratitude and appreciation. Make friends with your inner gypsy. Being charitable makes many returns. Spiritual peace. Emotional walls removed which allows the flow of energy. Optimism. Been there, done that, and you're smarter now - because of it. Self-realization. You've experienced the good and the bad, and now you make wise choices to reach the middle ground.

DEAR GOD NO. Olivia Karas has fallen on beam. Michigan has five routines to get through now. Opening hit for Frowein. Florida to beam/ Kennedy Baker - walkover to bhs is hit - straddle to a tight split 1/2 - side aerial to stuck full. McNeer has fallen for Alabama on beam! The beam fall monster arises. Dana Duckworth is going to have a lot of facial expressions about this. Frowein 9.700 for Stanford. Charlie Owens 9.700 on floor. Why have we only see about half a routine so far in Michigan, Brown - BB -aerial to bhs is very solid - strong splits - hits side somi - sticks 2/1. Got that one down. Kentyucky just had a disastrous fall on vault from Stuart. Can't afford her to be compromised for the next two rotations. Michigan has Marinez up on beam now - lovely splits - nails side aerial - dismounts to her KNEES. Beam disaster for Michigan. Aja Sims step forward on her double back. Alabama getting through with hits now.
logoblog

0 Response to " Cairn Curran Reservoir Outlet Upgrade Stage 1 "

Post a Comment